临海大体量土石方长距离皮带输送技术

作者:卢建文 蔡庆军 王朝龙 胡帅 张胜阳
单位:中国建筑第八工程局有限公司华南分公司
摘要:深圳宝安国际机场卫星厅及配套工程中,外运土石方总量达114万m3。为解决土石方外运困局,以皮带输送机作为主要运输工具,通过研究与总结临海大体量土石方长距离皮带输送技术,克服土石方装筛、长距离运输、卸土装船及绿色施工等输送难题,不仅确保运输效率,且创造经济效益,应用效果良好。
关键词:机场卫星厅输送系统土石方输送机
作者简介:卢建文,工程师,E-mail:395085399@qq.com。
基金:中建八局科技研发项目:填海滩涂区全埋轨道交通群上盖不停航改扩建机场工程关键施工技术研究(2019-3-33)。 -页码-:12-17
尊敬的用户,本篇文章需要20元,点击支付交费后阅读
参考文献[1] 张海学,周淮,蒋鹏,等.皮带输送机土石方施工新工艺在淮河入江水道整治工程中的研制与应用[J].水利技术监督,2017,25(1):42-45.
[2] 高洋,庞程程,吴国强,等.大型屋顶绿色花园土石方运输施工技术[J].建筑施工,2016,38(4):472-473.
[3] 张磊,刘长和,谷静波.复杂地形条件下长距离带式输送系统工程设计探讨[J].起重运输机械,2015(4):1-4.
[4] 马真贵,杨桢贤.输送机出土技术在狭窄超深基坑工程中的应用[J].四川建筑,2013,33(5):189-191.
[5] 徐安军,李耀良,张永洲,等.履带式折叠皮带输送机在水平运输土石方中的应用[J].建筑施工,2012,34(12):1171-1172,1183.
[6] 郭丽丽.煤矿带式输送机综合监控系统的设计与应用[J].矿业装备,2021(2):262-263.
[7] 李珂.带式输送机运输系统的安全控制研究[J].机械管理开发,2021,36(2):223-224,236.
[8] 高广恒,郭增彩,于野.长距离带式输送机系统工艺设计优化[J].港口装卸,2020(2):37-39.
[9] 范志高,简新平,王登高.基于PLC控制的带式输送机系统设计[J].煤炭工程,2007(1):23-25.
Long Distance Belt Conveying Technology for Large Volume Earth and Rock Near the Sea
LU Jianwen CAI Qingjun WANG Chaolong HU Shuai ZHANG Shengyang
(China Construction Eighth Engineering Division Co.,Ltd.Southchina Branch)
Abstract: The total transportation of earth and stone work amounted to 1. 14 million m3 in the satellite hall and its supporting projects of Shenzhen Bao'an International Airport. As a breakthrough point,belt conveyors were taken as the main transportation tool in the problem-solving of the transportation of earth and stone work. Technical problems of belt conveying,such as loading and screening,long-distance transportation,unloading and loading,and green construction,have been overcome through developing and summarizing a complete and systematic set of long-distance belt conveying technology for large volume earth and stone work offshore, which not only ensures the construction and transportation efficiency,but also brings economic benefits,exhibiting good application effect.
Keywords: airports; satellite hall; convey system; earth and rock; conveyors
985 0 0
文字:     A-     A+     默认 取消