叠合预制装配式地铁车站结构体系的策划与试验研究

作者:郭正兴 耿佳名 徐政 潘清 刘毅 徐军林 邢琼
单位:东南大学土木工程学院 无锡地铁集团有限公司 中铁第四勘察设计院集团有限公司
摘要:为研究叠合预制装配式地铁车站结构体系的侧墙底节点与顶节点在设计荷载工况下的受力性能,结合无锡—江阴城际轨道交通工程,设计制作了足尺的侧墙与底板节点试件及足尺的侧墙与顶板节点试件,通过拟静力试验研究节点在低周往复荷载作用下的受力性能。结果表明,预制拼装侧墙节点试件的承载能力较现浇节点试件的极限承载能力略低,但可以满足构件设计的承载能力要求; U形钢筋的搭接连接能够有效传递荷载;在U形筋侧面混凝土保护层较薄的情况下,钢筋黏结强度较早出现退化,增加了U形钢筋弯弧及水平段对其内外侧混凝土的压力,造成了周围混凝土的剥落,同时,随着压力的增加有可能发生弯弧段钢筋的脆性断裂。
关键词:地铁车站装配式叠合板试验受力性能
作者简介:郭正兴,教授,博士生导师,E-mail:guozx195608@126.com。
基金:江苏省住建厅科技项目(2019ZD139)。 -页码-:1-5
尊敬的用户,本篇文章需要20元,点击支付交费后阅读
参考文献[1] TAO L J,DING P,SHI C,et al.Shaking table test on seismic response characteristics of prefabricated.subway station structure[J].Tunnelling and underground space technology,2019,91.
[2] DING P,TAO L J,YANG X R,et al.Three-dimensional dynamic response analysis of a single-ring structure in a prefabricated subway station[J].Sustainable cities and society,2019,45:271-286.
[3] FRAROV.New Conception of underground railways[M].Moscow,1994.
[4] 勿拉索夫,库拉金.俄罗斯地下铁道建设精要[M].钱七虎,戚承志,译.北京:中国铁道出版社,2012.
[5] 杨秀仁,黄美群.地铁车站预制装配新技术研究策略[J].都市快轨交通,2018,31(1):78-85.
[6] 杨秀仁,黄美群,林放.地铁车站预制装配式结构注浆式榫槽接头弯曲抵抗作用特性研究[J].土木工程学报,2020,53(2):33-40.
[7] 杨秀仁,林放,黄美群.地铁车站预制装配式结构注浆式单榫长接头抗弯承载性能试验研究[J].土木工程学报,2020,53(4):111-118,128.
[8] 杨秀仁,黄美群,林放.地铁车站预制装配式结构注浆式单榫短接头抗弯承载性能试验研究[J].土木工程学报,2020,53(5):57-64.
[9] 张喻捷.套筒连接装配式地铁车站结构三维抗震性能评价方法研究[D].北京:北京工业大学,2016.
[10] 王国富,王德超,路林海,等.济南轨道交通R1线工程新技术探索及应用[J].都市快轨交通,2017,30(6):7-13.
Planning and Experimental Research on the Structural System of Laminated Prefabricated Subway Station
GUO Zhengxing GENG Jiaming XU Zheng PAN Qing LIU Yi XU Junlin XING Qiong
(Institute of Civil Engineering Construction,Southeast University Wuxi Metro Group Co.,Ltd. China Railway Siyuan Survey and Design Group Co.,Ltd.)
Abstract: In order to study the mechanical performance of the bottom node and top node of the side wall of the laminated prefabricated subway station structure system under the design load conditions,combined with the Wuxi-Jiangyin intercity rail transit project,the full-scale side wall and bottom plate joint specimens and the full-scale side wall and top plate joint specimens are designed and produced,and the force performance of the joints under low-cycle reciprocating loads is studied through pseudo-static tests.The results show that the load-bearing capacity of the prefabricated side wall joint specimen is slightly lower than the ultimate load-bearing capacity of the cast-in-place joint specimen,but it can meet the load-bearing capacity requirements of the component design; the overlap connection of the U-shaped steel bar can effectively transfer the load.When the protective layer of concrete on the side of the shaped bars is thin,the bond strength of the steel bars deteriorates earlier,which increases the pressure on the inner and outer concrete of the U-shaped bar bending and the horizontal section,causing the surrounding concrete to peel off. At the same time,as the pressure increases,brittle fracture of the steel bars in the curved arc may occur.
Keywords: subway stations; prefabricated; laminated wall panels; testing; mechanical properties
983 0 0
文字:     A-     A+     默认 取消